Jiangxi Xingbo Hotel applied imitation silver foil to over 1,000 square meters of the ceiling. First, the ceiling was smoothed with ICI. First, water-based glue was applied and allowed to sit for about 40 minutes. Then, the imitation silver foil was applied. To create a textured effect, the foil was wrinkled and then applied. Third, excess foil was cleaned. Fourth, the surface was covered with a water-based protective coating, spraying it thinly and evenly.